Advanced Energy Storage Solutions for Secure Charging Systems

Customization: Available
Connector Type: CCS1, CCS2, CHAdeMO, GB/T, Tesla
Installation: Floor Type

Product Description

Energy Storage Solutions
ℹ️ Basic Information
Model NO.
FH-ES-257
Location
Public Use
Interfaces
Battery+EV Charger
Start Mode
RFID, Credit Card, Mobile
Operating Voltage
648-934.4 V
Max DC Current
158 A
Charge/Discharge Rate
≤0.5p
Depth of Discharge
100%/90%
Storage Temp
-20~45℃
Output Voltage
AC380V
Origin
China
📦 Product Description

This product uses a zero-capacity-increment, flexible smart charging pile as the energy storage and charging system carrier. With modular design, it integrates lithium iron phosphate battery cabinets, battery management system (BMS), power conversion system (PCS), DC-DC charging system, local control system (EMS), air conditioning, fire protection, and other devices into one, providing a core solution for both energy storage and charging.

It aims to improve energy efficiency, lower costs, and enhance power supply reliability and stability. Suitable for EV charging stations, commercial complexes, industrial parks, residential communities, and emergency power supply sites, optimizing power resource allocation and supporting the popularity of new energy vehicles.

Integrated Charging Machine
📊 Product Parameter
Model FH-ES-215 FH-ES-241 FH-ES-257
DC Side Parameters
Battery Standard Capacity (kWh) 215 241 257
Cell Type LFP 280Ah LFP 280Ah LFP 280Ah
Nominal Power (kW) 100 125 125
Voltage Range (V) 648~876 648~876 691.2~934.4
AC Side Parameters
Output Nominal Power (kW) 100 125 125
Output Voltage AC380V AC380V AC380V
THD <3% <3% <3%
System Parameters
System Efficiency ≥90% ≥90% ≥90% ≥90%
Protection / Temp IP54 / -20~+55℃ IP54 IP54 IP54
🔍 Product Details
Fast Charging
Fast Charging Capability
Ideal solution for commercial public applications where users require fast charging.
Durability
Reliability and Durability
Resistant to dust and water (IP54). Long-lasting solution for frequent use.
🛠️ Production Process
Production Process
🔗 Related Products
Related Products Grid
🏢 Company Profile
Profile 1
Profile 2
Profile 3
Profile 4
Profile 5
Profile 6
Profile 7
Profile 8
Frequently Asked Questions
Do you have inspection before delivery?
Yes. We have a specialized QC team to perform random and 100% inspections before delivery to ensure quality.
What is the standard leading time?
The standard lead-time is normally 15-25 days, though it may vary during peak seasons.
Can you provide customized services?
Yes, we offer OEM and ODM services. We also provide various customized options for specific product categories.
Are you a manufacturer?
Yes, we are a manufacturer with a strong R&D team dedicated to energy storage and charging solutions.
What are the packaging details?
Most products are packed in secure carton boxes, and packaging can be customized upon customer request.
Is this system suitable for public commercial use?
Absolutely. It is specifically designed for public use, including EV charging stations, commercial complexes, and industrial parks.

Related Products