Chinese Industrial Structural Heavy Duty Warehouse Storage Shelving Racks Drive in Racking System

Customization: Available
After-sales Service: Yes
Warranty: 1 Years

Product Description

Basic Information
Usage
Tool Rack, Beverage, Clothing, Tools, Supermarket, Food, Industrial, Warehouse Rack
Material
Reinforced Concrete
Structure
Shelf
Type
Drive-In Pallet Racking
Mobility
Adjustable
Height
5-15m
Weight
1000-2000kg
Surface
Powder Coating
Certificates
ISO9001, AS4084, CE, FEM
Capacity
10000t/Year
Drive in Shuttle Racking System

Shuttle racking adopts shuttle cart as the main access equipment. The storage capacity of the system can reach 80%, and it can easily realize FIFO or LIFO. The wireless remote controller of shuttle car can ensure personal safety and add efficiency to warehousing operations. The guide rail produced by special forming machines ensures the smooth operation of the system.

Shuttle Racking System 1
Shuttle Racking System 2
Technical Specifications
Load capacity: 500kg-1500kg
Walking speed: MAX 50m/min
Control mode: Handheld wireless remote control
Operation Environment: Cold Storage Temperature down to -25 degrees
Technical Drawing
Key Advantages
Achieve the highest density of storage, significantly reducing warehouse construction costs.
Flexible goods management: Choose between First-In-First-Out (FIFO) or First-In-Last-Out (LIFO).
High efficiency: Operates without requiring forklifts to drive into the lanes.
Superior Safety: Seismic safety performance is significantly higher than traditional drive-in racking.
Racking Advantage Diagram
Product Portfolio & Services
Medium duty shelving
Heavy duty pallet racking, drive in racking, shuttle racking
Mezzanine and Platform systems
Customized flow-through and mobile racking
Logistics Warehousing System Planning and Design
Automated Stereo Warehouse Systems
Steel pallets, storage cages, and workstation appliances
Product 1
Product 2
Product 3
Project 1
Project 2
Quality Assurance
Factory View 1
Factory View 2
Certification 1
Certification 2
Facility 1
Facility 2
Facility 3
Frequently Asked Questions (FAQ)
Q1: What are your standard payment terms?
We typically require a T/T 30% deposit, with the remaining 70% due upon receipt of the B/L copy. L/C is also accepted.
Q2: What is the average production lead time?
Production generally takes between 2 to 4 weeks, depending on the complexity of the shuttle racking or mezzanine systems.
Q3: Can I get a sample of the racking materials?
Yes, we provide free small samples which are typically ready within 5 days.
Q4: What raw materials are used in your racking systems?
Our primary raw material is high-quality Q235B steel.
Q5: Do you offer installation support?
We provide free installation drawings for all systems. If required, we can also arrange for a technician to assist with installation on-site.
Q6: What is the warranty period for your products?
All our racking products come with a 1-year warranty.

Related Products