GMP Modular Cultivation Cleanroom System with Fire Proof Sandwich Wall Panel Clean Room Grow Rooms

Still deciding? Get samples of $ !
Request Sample

Product Description

Technical Specifications
Model NO.
Cleanroom
Core Components
PLC, Motor
Material
Sandwich Panel
Size
Customized Size
Certification
ISO, CE
Warranty
Industry Warranty for Two Years
HS Code
1111111
Capacity
6000 pieces per Year
Product Introduction

Cleanrooms are essential to any manufacturing process where particulate contamination can affect the quality of goods produced. Specific clean room classifications and ISO class code descriptions provide protective guidelines and secure environments through controlled air filtration, which lowers the possibility of product contamination or large particulate interference within critical process manufacturing.

Additionally, clean room classifications require that positive pressure is continuously maintained while the cleanroom is operational. This process prevents contaminated air from flowing back within the clean air environment, allowing clean filtered air to continuously flow from clean to less-clean spaces.

Cleanroom Project Scope
1 Structure

Wall Panel, Ceiling Panel, Windows, Doors, Fittings, Flooring

2 HVAC System

AHU, Chiller, Dehumidifier, Ducting, Piping, etc.

3 Electrical

Lighting, Switch, Cables, Power Distribution Cabinet, etc.

4 Auto-Control

PLC Controller, Sensors for Humidity and Temperature, Control Panel

Equipment & Systems Air shower, Cargo shower, Mist shower, Dynamic/Static pass box, Sampling booth, Weighing booth, Dispensing booth, VHP sterilizer, FFU, LAF, etc.
Environmental Control Temperature: 21-27°C | Humidity: 30-60% (Customizable)
Main Applications Pharmaceutical factory, hospital, medical device, electronics, food and cosmetics industries.
Service Support FAT and SAT Service, Professional Consultation, Training, 24 hours technical support.
Product Display
Manufacturing Facility
Quality Assurance & Visits
Frequently Asked Questions
Q1: What products do you manufacture?
We focus on cleanroom projects, air showers, FFUs, pass boxes, dispensing booths, laminar air flow hoods, AHUs, and hermetic doors & windows.
Q2: What is the typical lead time for a project?
For a complete cleanroom project including AHU systems, the typical lead time is approximately 35 days.
Q3: What kind of warranty and after-sale service is provided?
We offer a 2-year warranty from project completion. During this period, we provide replacement parts and technical engineering support if issues arise.
Q4: Can you provide cleanroom validation documentation?
Yes, we provide full validation documentation including DQ, IQ, OQ, PQ, as well as FAT/SAT reports, operation manuals, and maintenance guidance.
Q5: What technical advantages do you offer?
We have a professional team of 12 senior cleanroom & HVAC engineers and have successfully completed over 2,100 cleanroom projects worldwide across various industries.

Related Products